Traffic-free path

Alloway to Burton path and NCN 7

Two traffic-free miles on the old railway, linked since 2023 by an underpass under Dunure Road, then three miles on NCN 7 to the town centre.

Hidden gem

Alloway to Burton path and NCN 7
Photo: Rosser1954, CC BY-SA 4.0

The Alloway to Burton Path runs for two traffic-free miles from Maybole Road along the dismantled Maidens and Dunure Light Railway. In June 2023 a 1.4 million pound project opened a new underpass on Dunure Road, through a former rail tunnel, so people walking and cycling no longer cross the busy road.

The same project created the Sense-Ayr-Ee sensory garden, with a wetland, a boardwalk and planting chosen for touch, scent and sound. From the underpass, National Cycle Network Route 7 gives a three-mile ride to Ayr town centre.

Path length
2 miles, traffic-free
Underpass opened
June 2023
To town centre
3 miles on NCN 7

Nearby

Where this comes from

Something wrong? Leave a note on OpenStreetMap at this spot.